/ The operational control layer for manufacturing
5 processes/Cutting · Embellishment · Embroidery · Sewing · Washing

Your systems report the factory.
Factory OS controls it.

The real-time control layer for planning, production, quality and maintenance, and the foundation your factory's AI runs on. Live in 145 factories.

LIVEFactory OS · Order lifecycleOB-4471 · 42,000 pcs
  1. PO confirmedDay 0
  2. Cutting startDay 3
  3. Embellishment startDay 5
  4. Cut kit readinessDay 6
  5. PSD · production startDay 7
  6. PED · production endDay 21
  7. WashingDay 23
  8. FinishingDay 25
  9. PackingDay 27
Wash load imbalanced. Plani8 rebalanced.
Group OTL
81%
RFT today
97%
Factories live
145
145
Factories
live today
8
Countries
running live
850M+
Articles
produced
4.2M
Production articles
savings delivered
"A robust production system needs both visibility and control. Solvei8's end-to-end depth, ease of use and implementation support made it the right choice for us."Shanmugam, Premier Knits · India
Method: Aggregated across 145 live customers, 2021–2025 · Based on customer-reported operational KPIs
Trusted by apparel groups acrossIndia / Bangladesh / Sri Lanka / Indonesia / Vietnam / South Korea / Singapore
YoungoneBangladesh / Vietnam
AnantaBangladesh
ArvindIndia
ConcordSri Lanka
Global IndoIndonesia
PT Sai ApparelIndonesia
MASSri Lanka
ViyellatexBangladesh

One operational brain. Every CXO view.

A planner, a quality lead, a reliability engineer and a CXO seeing the same Factory OS data, the same shift. Replacing the siloed MES, planning and QMS stack they used to switch between.

LIVEFactory OS / Plani8 Pro
Group rollup / Tue 15:22
AUTO-LOADING AGENT / 4-WEEK PRODUCTION BOARD
WK 1WK 2WK 3WK 4WK 5
LINE 01
ORD-01
ORD-02
S-01
ORD-03
ORD-04
LINE 02
ORD-05
S-02
ORD-06
ORD-07
LINE 03
S-03
ORD-08
ORD-09↑ moved
ORD-10
S-04
Confirmed ordersAgent-loaded / re-sequencedShort runs (S-01…)Agent loaded 3 orders / re-sequenced 1 for earlier ETA
RIGHT-FIRST-TIME / LAST 4 HOURS · TOP DEFECT CODES
Line 02 / F03 Java
99%
Line 04 / F02 Avissawella
87%
Line 09 / F01 Nam Dinh
94%
Line 14 / F04 Dhaka
96%
DEF-04sleeve attach▲ 12
DEF-09hem alignment8
DEF-12button gap5
DEF-21label skew3
Group RFT today / 97%Tracki8 flagged Line 04 / corrective issued to mechanic at 11:18
MACHINE REQUIREMENT VS AVAILABILITY / NEXT 4 WEEKS
WK 1
on plan
WK 2
on plan
WK 3
gap surfaced
WK 4
on plan
Forecasted demandAvailable capacityWK 3 capacity gap surfaced 7 weeks ahead of season commit
NATURAL-LANGUAGE ROOT CAUSE / CITED EVIDENCE
Which orders are at risk this week, and why?
3 orders on the watch list. Pulling from order book, planning and quality.
ORD-1024Buyer ETA 19 Jun / fabric pending, 2-day riskat risk
ORD-1108Buyer ETA 22 Jun / Op 5 quality alert on Line 04at risk
ORD-1156Buyer ETA 25 Jun / material gap, vendor not confirmedcritical
cited / order book · Plani8 risk feed · Tracki8 RFT · vendor PO log

MES, planning, QMS / they digitize work.
Who's running the outcomes?

Most enterprise stacks are stitched from siloed systems built to record what already happened. They show data. They don't run the factory. By the time the report reaches the C-suite, the situation has moved on and the shipment is already at risk.

01The report arrives too late.

End-of-day rollups describe a situation that no longer exists.

A morning DHU breach sits inside a mid-day Excel review. Course correction lands next shift, after the damage. Factory OS closes the same loop in minutes.

DHU% over a single shift
With Factory OSWithout Factory OS
5%4%3%2% baseline1%T+0T+1hT+2hT+3hT+4hT+5hT+6hT+7hT+8h
With Factory OS4.5% → 3.5% under 30 min · 2.75% within the hour
T+0DHU breach detectedT+2 minAlert raised with contextT+5 minSupervisor escalates to QMT+11 minCAP approvedT+30 minDHU down to 3.5%T+1 hrDHU down to 2.75%
Without Factory OSDHU 4.5% all day · fix next shift
T+4 hrsExcel mid-day review catches itT+5 hrsQM triggered, no root causeT+8 hrsNext shift, course correction
02Issues escalate before anyone acts.

A 9 a.m. machine fault waits half a day to reach the right desk.

5.5 hrs
industry-standard delay from incident on the floor to action with the right stakeholder
03Planning and execution are disconnected.

A 4-day fabric delay cascades into 4 lost sewing days.

FabricCuttingEmbell.Sewing4 lost daysD1D5D10D15D20D25 ship
PlanActualLost sewing daysSewing window compressed 4 days
/ Pro products in motion

Three signals.
Three corrections.

Across planning, quality and workforce, Factory OS detects the early signal, recommends the right move, and closes the loop before the situation lands on the leadership desk. Three concrete moments live in production today. Not roadmap. Not pilot.

Plani8 · Planning

Fabric delayed by 2 days. PCD held.

Mill flags a 2-day delay on fabric in-house. Plani8 checks live cutting-room capacity, splits the order across two cutting tables to absorb the delay, and re-sequences a lower-priority order to free that second table. Sewing starts on the original PCD. Buyer ETA never moves.

PCD held · ETA 19 Jun protected22 seconds end to end
Order B1204 · 12,400 pcsTue 14:38
Day 1Day 5Day 10Day 15Day 20
Fabric in-housemill flag
+2d
CutCT-01 + CT-02
split × 2 tables
SewingLine 14
PCD held
19 Jun · ETA
14:38:02Fabric mill flagged 2-day in-house delaylogged
14:38:11Plani8 split cutting across CT-01 + CT-02 · PCD heldcascaded
14:38:17Plani8 re-sequenced ORD-B205 · earlier-ETA order prioritisedapproved
14:38:22Sewing starts on PCD · buyer ETA 19 Jun heldprotected
Tracki8 · Quality

Defects piling at Op 5. Corrected at the source.

Tracki8's line-scoring engine flags an unusual defect cluster at Op 5. The quality manager is alerted, and a parallel machine-issue ticket is auto-routed to the on-floor mechanic. The deviation closes before the next bundle finishes the line.

Defect rate normalised3 minutes 42 seconds
Line 04 · F02 Avissawella · operation flowTue 11:14
01cut
02join
03over
04seam
05attach
06trim
07label
08press
09audit
10pack
Op 5 defect rate · 8.4% on last 120 pcs12
Quality manager notified
Vimala R · Avissawella QA
routed
Machine ticket · Op 5 sleeve attach
Rakesh M · floor mechanic · ETA 4 min
dispatched
Skilli8 · Workforce

Operator output dropped 24%. Line rebalanced before the shift ended.

Skilli8 sees a sustained efficiency dip on a specific operator before the line's hourly tally even closes. It surfaces the skill gap, recommends pairing with a senior operator on the parallel station, and tracks recovery. Output is back on target inside the same shift.

Output recovered to target28 minutes to recovery
Line 02 · F03 Java · operator efficiencyTue 15:22
#OperatorEfficiencyNow
PRPriya RLine 02 · Op 03
108%
MSMeena SLine 02 · Op 05
76%
AKArun KLine 02 · Op 07
98%
Skilli8 recommends: Re-pair Op 05 with Priya R for the next 30 minutes. Skill gap: pocket-attach SAM variance. Training tag added to operator profile.Confidence 0.84 · based on 92 prior pairings on this style
/ The new standard for modern apparel factories

Factory OS.
The operational system.

Three modules form the foundation: live view for leadership, live plan for planners, live system for the floor. Live in 145 apparel factories today. Built to replace siloed MES, planning and QMS tools.

Plani8 · Planning

Plani8

5 processes. One connected plan.

The only planning system that links cutting, embellishment, embroidery, sewing and washing into one live plan. Hard pre-production gates, fabric and trim readiness from your ERP, and actuals that recalibrate the strip the moment the floor moves. One workflow from style approval to sewing plan — five processes moving as one.

  • Pre-production as a hard gate, system enforced
  • Material readiness flowing live from WMS / ERP
  • Actuals recalibrate the plan, downstream conflict flagged
Step 01
PO loaded from ERP
Step 02
T&A assigned
Step 03
Capacity blocked
Step 04
MRP check for available stock
Step 05
Pre-production gate assigned
Step 06
Embellishment capacity validated
Step 07
PSD assigned
Step 08
Delivery commitment check
143lines planned this week / 4 plants
12 hrsavg replan cycle / down from 4 days
+11%on-time loading / vs last quarter
Tracki8 · Execution & quality

Tracki8

Real-time production and order reconciliation

Every piece, every department, every shift. Tracki8 reconciles WIP by size and colorway across the full production path, so a planner sees exactly where an order sits before the buyer asks.

Order B1204Indigo · 12,400 pcs29% packed
Department
S
M
L
XL
XXL
1Warehouse
-
-
-
-
-
2Cutting
30
50
60
40
20
3Embellishment
120
210
230
150
90
4Preparatory
180
310
350
230
130
5Sewing line
360
620
700
460
260
6Washing
270
470
520
340
200
7Finishing
220
390
440
290
170
8AQL
140
240
260
170
100
9Packing
480
910
1,040
720
430
Maintaini8 · Reliability

Maintaini8

Machine downtime, MTBF and MTTR, NPT with auto-escalation

The moment a machine drops, Maintaini8 raises the issue with full context, a draft corrective action plan, and the right stakeholder. The legacy industry waits for the EOD report. Maintaini8 closes the loop in under five minutes.

Issue to action turnaroundscale / 24h max
Industry std
1 day
Maintaini8
< 5 min
Inside the < 5 min response
01Issue + context raised
02Corrective action plan
03Escalation matrix L1 → L3
NPT today
26min/shift
↓ from 41 min
MTBF machine class
14.2hrs
↑ +18% qtr
MTTR per incident
12min
↓ -32% qtr
/ Standalone Pro products · the upper tier

Pro products. For the operators
the rest benchmark against.

Most factories are still trying to see their operations. A smaller class is already compressing them. Pro is built for that class: you ran a custom MES, built an in-house planner, squeezed every drop from your legacy stack. Three specialist agents now attack the 73% of order time no first-generation system was designed to touch, live with the most mature manufacturing groups across India, Bangladesh, Sri Lanka, Indonesia and Vietnam.

Order lifecycle · 73% non-producing timePro products attack upstream
Costing4-5 days
PO confirm2-3 days
Procurement3-4 days
Machine plan2-3 days
Material in-house45-50 days
MFG23%
Engineeri8Attacks at costing. Techpack to Bill of Labor in minutes, not 4-5 days.
Plani8 ProAttacks at PO confirmation. Delivery commitment validated, capacity blocked, T&A tasks assigned in minutes.
Plani8 ProReturns at machine plan. Next month's machine requirement forecasted in days, not weeks.
73% non-producing (Pro products target zone)23% MFG (base Factory OS)Where Pro products compress the cycle
Factory OS
The operational brain
"Run the factory, end to end."

Live planning, production, quality, maintenance and operator tracking. The foundation 145 apparel factories run on today. The baseline every Pro product plugs into when the ceiling gets low.

  • Plani8 · planning and capacity
  • Tracki8 · production and quality control
  • Maintaini8 · machine downtime, MTBF, MTTR
  • Skilli8 · operator output tracking
plus, when ready
Pro products
For the operators above the rest
"Raise the ceiling your team already hit."

For groups running mature operations on a custom MES, an in-house planner or a legacy stack you've outgrown. Three power-user specialists each attack a stage of the 73% non-producing time. Opt-in. Modular. No rip-and-replace.

  • Plani8 Pro · secondary capacity, auto-loading agent
  • Engineeri8 · Bill of Labor automation
  • AI Bot · natural-language factory intelligence
Voices from the floor
Operational excellence, amplified.

"Within a year, Solvei8 has supercharged our operations: accelerating throughput, lifting quality, skyrocketing RFT. We're not just hitting targets, we're exceeding them with precision."

Rehan IdreseeMohammadi Group
Bangladesh
Real-time operations, end to end.

"Quality, production and work-in-progress are now mapped live across every shift. Responsibility and accountability have stepped up across the floor."

Maashed AbdullahDressmen Group
Bangladesh
A new 'Right First Time' benchmark.

"Solvei8 transformed our operational efficiency with seamless tracking and the kind of insight we'd been missing. It sets a new benchmark for excellence."

JW KimApparelTech
Korea
73% non-producing time
23% MFG
PO placedMaterial receivedShipped
Pro

Plani8 Pro

Secondary capacity, auto-loading agent (beta), machine forecast

The only planning system that links all 5 garment processes — cutting, embellishment, embroidery, sewing, and washing — into one connected plan. Reschedule sewing, and the four secondaries auto-cascade in real time.

4-5 hrsLoading plan time
down to under 1 hr with auto-loading agent
7 wksAverage lead time
capacity gaps surface ahead of season commit
CentralSewing plan
82%
changes auto-cascade to linked processes
Cutting
68%
Embellishment
54%
Washing
74%
In build

Engineeri8

Bill of Labor automation

Techpack to Bill of Labor in minutes. MTM2-based SAM, confidence-scored.

Pocket attach · SAM0.42 min
Sleeve setting · SAM1.14 min
Bottom hem · SAM0.36 min
Garment BoL · total SAM14.8 min
In build

AI Bot

Natural-language factory intelligence

Ask the factory in plain language. Cited answers in seconds.

You /Why did Plant 07 miss OTL yesterday?
AI Bot /Two factors. Line 09 lost 1h 14m to a sleeve-attach machine fault. Line 14 ran 4.6% below SAM after Op 5 operator change at 11:20.
cited · Maintaini8 fault log · Skilli8 operator timeline · Tracki8 SAM variance

Every safeguard your
IT and procurement teams
already require.

Factory OS is built for groups, not single plants. It deploys in six weeks on the stack you already run, integrates with the ERP you already paid for, and meets the security bar your CIO has already signed off on.

From 1 factory to 50. Multi-site, multi-country, multi-currency. One platform that grows with your group.

Enterprise-grade access controls
Role-based access, encrypted data in transit, audit-ready API integrations. Your operational data stays yours.
ERP and buyer-system integration
Native connectors for SAP, Oracle and major ERPs. REST API for everything else. No rip-and-replace.
Live in 6 weeks, not 6 quarters
Dedicated implementation team. No disruption to running operations. Cutover by shift, not by site.
Built for groups, scaled by design
From 1 plant to 50. Multi-site, multi-country, multi-currency. One source of truth, all the way back to HQ.
/ Run it on your factory

What the control layer
is worth to you.

Enter your numbers. See the annual margin Factory OS targets across throughput, quality and expediting, using conservative benchmark gains from live deployments.

Monthly output
800,000 pcs
Average garment FOB value
$4.80
Current average line efficiency
50%
Current rework / DHU rate
4.2%

Benchmark gains applied: efficiency +5 points, rework down 25%, expediting down 0.4% of order value. Illustrative estimate from your inputs, not a quote.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
LIVE ESTIMATEAnnual margin at stake
$742K/yr
Throughput gain$461K
Quality / rework$97K
Expedite avoidance$184K
Extra sellable output
960Kpcs/yr
Rework units avoided
101Kpcs/yr
Pressure-test these numbers
Executive briefing

Tell us who you are.
We'll call you.

A 30-minute walkthrough on your order book, your plants, your numbers. Book a slot, share a phone number, and a Solvei8 partner will call within two business hours to schedule the briefing.

We call within 2 business hours · IST-friendly slots

Book your executive briefing

Please share the name we should ask for on the call.
A work email lets us send a calendar hold.
We call, not email. Please share a WhatsApp-capable number.
Which group are we briefing?
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Sending your request…
One moment. We'll confirm shortly.
You're on our list.
A Solvei8 partner will call within two business hours. We've also sent a confirmation to your email.
Something went wrong.
Please retry, or call us directly at +91 98733 97991.

Book your executive briefing

Please share the name we should ask for on the call.
A work email lets us send a calendar hold.
We call, not email. Please share a WhatsApp-capable number.
Which group are we briefing?
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Sending your request…
One moment. We'll confirm shortly.
You're on our list.
A Solvei8 partner will call within two business hours. We've also sent a confirmation to your email.
Something went wrong.
Please retry, or call us directly at +91 98733 97991.